AI Rampage

Page 30

Panel view ↗
The group listens to Arlo through a satellite handset as Leena holds the plant key.
  1. Arlo: One node to disable. Keep power generation running, record every change, and keep anything you remove.
  2. Leena: Let's hope this is the end of it.
Open picture in panel view ↗
An open service enclosure reveals the coupling separate from the normal network.
  1. Leena: This is the backup service coupling. The normal network is separate.
Open picture in panel view ↗
Barney holds the detached optical bridge in front of the two disconnected sockets.
  1. Barney: I'll take out the bridge, it should be decoupled now.
  2. Dexy: Good. Keep it, we may need to put it back.
Open picture in panel view ↗
Dexy tells Ren that the handshake has stopped while the node continues running.
  1. Dexy: The handshake to the network stopped. The node is still running.
  2. Ren: Then let’s switch the node off.
Open picture in panel view ↗
Leena operates the local isolator while the group watches the Hill Annex equipment and gauge.
  1. Leena: Let's shut down the Annex node. But powering it up again will take a long time.
  2. Dexy: Let's see if Aster gets disabled.
Open picture in panel view ↗